Project Overview
Acting as Principal Contractor, Lee Contracting delivered the groundworks and structural package for a new 3,500-tonne capacity salt barn in Bootle.
The project supports essential winter maintenance operations and required heavy-duty concrete and structural works.
Scope of Works
- Installation of 500m² reinforced concrete slab
- Installation of precast thrust wall units
- Ring beam construction
- Steel erection support works
Key Features
- Large reinforced slab for heavy storage loads
- Precast thrust wall units and ring beam construction
- Full structural support for steel erection
Completed