Project Overview

Lee Contracting successfully completed the groundworks for an extension at a Special Educational Needs (SEN) school in Flint,
delivering additional teaching space for Read Construction Holdings Ltd.

Following the successful delivery, we are now on site with a further project for the same client, reflecting the trust and confidence
they place in our team.

This project required careful groundworks delivery within a live educational environment, including the use of sustainable fill material
to create a raised embankment alongside foundations, drainage, and services.

Scope of Works

  • Topsoil strip and stockpiling
  • Import and placement of structural fill (5,000–6,000 tonnes Class 1 IBAA for raised embankment)
  • Pad foundations
  • Installation of attenuation tanks
  • Sewer connections, drainage, and services

Key Features

  • Sustainable use of 5,000–6,000 tonnes of Class 1 Incinerator Bottom Ash Aggregate (IBAA), reducing landfill and carbon impact while providing excellent load-bearing performance
  • Works completed efficiently within an operational school environment
  • Strong client relationship leading to repeat commissions