Project Overview
Lee Contracting successfully completed the groundworks for an extension at a Special Educational Needs (SEN) school in Flint,
delivering additional teaching space for Read Construction Holdings Ltd.
Following the successful delivery, we are now on site with a further project for the same client, reflecting the trust and confidence
they place in our team.
This project required careful groundworks delivery within a live educational environment, including the use of sustainable fill material
to create a raised embankment alongside foundations, drainage, and services.
Scope of Works
- Topsoil strip and stockpiling
- Import and placement of structural fill (5,000–6,000 tonnes Class 1 IBAA for raised embankment)
- Pad foundations
- Installation of attenuation tanks
- Sewer connections, drainage, and services
Key Features
- Sustainable use of 5,000–6,000 tonnes of Class 1 Incinerator Bottom Ash Aggregate (IBAA), reducing landfill and carbon impact while providing excellent load-bearing performance
- Works completed efficiently within an operational school environment
- Strong client relationship leading to repeat commissions
Completed