Project Overview
Lee Contracting delivered the groundworks and land drainage improvements for the overflow car park and solar array installation at Crocky Trail.
The project combined sustainable drainage, durable access infrastructure, and enabling works for renewable energy installation.
Scope of Works
- New land drainage system to field overflow car park
- Land drainage connected into existing surface water drainage system
- New Grass Crete roads into overflow car park
- Foundations to new ground-mounted solar array
- New substation to take electrical output from solar array
Key Features
- Sustainable drainage solution integrating with the existing surface water system
- Durable Grass Crete surfacing for overflow parking
- Ground-mounted solar array foundations and dedicated substation
- Enhanced land drainage to help prevent flooding in the overflow car park
Completed