Lee Contracting delivered an extensive groundworks package for The Gables, a residential development located near Crosby in Liverpool.

The scheme comprised 30 new homes ranging from two to four bedrooms, requiring a coordinated approach to infrastructure, drainage,
substructure works, and external finishes to support timely delivery.

Scope of Works

  • Attenuation pipework – 90m of 750mm diameter pipe installed at depths of up to 3m
  • Reinforced strip foundations for residential plots
  • Power-floated concrete floor slabs installed on impermeable gas membranes (approx. 1,500m²)
  • Private plot drainage installations
  • Service trench excavation and installation
  • Private road infrastructure – approximately 1,060m² of tarmac surfacing
  • Hard landscaping including 2,200m² of block paving and 620m² of flagging

Key Features

  • Deep attenuation pipework installed at significant depth
  • Large-scale power-floated slabs with gas protection
  • High-quality hard landscaping with extensive block paving and flagging